TO DATE, A FEW OF THE REQUIRED REPAIRS HAVE BEEN MADE ADEQUATELY, BUT NOT ALL. ARBOR HOMES HAVE INFORMED US THAT THEY HAVE COMPLETED ALL OF THE REPAIRS THAT THEY INTEND TO DO ON OUR HOME. AFTER MANY ATTEMPTS TO SHOW THAT THERE WERE STILL ITEMS THAT NEEDED TO BE REPAIRED, THOSE REPAIRS HAVE NOT BEEN COMPLETED. ARBOR HOMES REFUSED TO TAKE ANY FURTHER ACTION TO RESOLVE THE REMAINING ISSUES.
WE HAD TO USE OUR OWN RESOURCES TO HAVE THE REMAINING ISSUES REPAIRED TO FINISH THE HOME THAT ARBOR HOMES CONTRACTED WITH US TO BUILD.
CUSTOMER ASSURANCE PLEDGE FROM ARBOR HOMES.
CLICK HERE
FOR A LARGER
VIEW OF THE CUSTOMER ASSURANCE PLEDGE FROM ARBOR HOMES, THEN CLICK THE BACK ARROW TO RETURN BACK TO THIS PAGE.
THE AUTHORS OPINION: WE FEEL THAT ARBOR HOMES
DID NOT
FOLLOW THROUGH WITH THEIR TO MEET OR EXCEED BAGI STANDARDS.
IMAGES OF THE HOME'S EXTERIOR AND GARAGE AREA AS ARBOR HOMES PRESENTED THE HOME TO US AT THE SIGNING. IMAGES OF THE HOME'S EXTERIOR AND GARAGE AREA AS ARBOR HOMES FINAL PRESENTATION OF THE
RECONSTRUCTION AND WE WERE ADVISED THAT NO OTHER WORK WILL BE DONE ON THESE AREAS.
IMAGES OF THE HOME'S FRONT ENTRY AREA AS ARBOR HOMES PRESENTED THE HOME TO US AT THE SIGNING. IMAGES OF THE HOME'S FRONT ENTRY AREA AS ARBOR HOMES FINAL PRESENTATION OF THE RECONSTRUCTION
AND WE WERE ADVISED THAT NO OTHER WORK WILL BE DONE ON THESE AREAS.
IMAGES OF THE FRONT BATHROOM HALLWAY AREA AS ARBOR HOMES PRESENTED THE HOME TO US AT THE SIGNING. IMAGES OF THE FRONT BATHROOM HALLWAY AREA AS ARBOR HOMES FINAL PRESENTATION OF THE
RECONSTRUCTION AND WE WERE ADVISED THAT NO OTHER WORK WILL BE DONE ON THESE AREAS.
IMAGES OF BEDROOM #2 AS ARBOR HOMES PRESENTED THE HOME TO US AT THE SIGNING. IMAGES OF BEDROOM #2 AS ARBOR HOMES FINAL PRESENTATION OF THE RECONSTRUCTION
AND WE WERE ADVISED THAT NO OTHER WORK WILL BE DONE ON THESE AREAS.
IMAGES OF THE MAIN HALLWAY AREA AS ARBOR HOMES PRESENTED THE HOME TO US AT THE SIGNING. IMAGES OF THE MAIN HALLWAY AREA AS ARBOR HOMES FINAL PRESENTATION OF RECONSTRUCTION
AND WE WERE ADVISED THAT NO OTHER WORK WILL BE DONE ON THESE AREAS.
IMAGES OF THE LAUNDRY ROOM AS ARBOR HOMES PRESENTED THE HOME TO US AT THE SIGNING. IMAGES OF THE LAUNDRY ROOM AS ARBOR HOMES FINAL PRESENTATION OF RECONSTRUCTION
AND WE WERE ADVISED THAT NO OTHER WORK WILL BE DONE ON THESE AREAS.
IMAGES OF THE KITCHEN AS ARBOR HOMES PRESENTED THE HOME TO US AT THE SIGNING. IMAGES OF THE KITCHEN AS ARBOR HOMES FINAL PRESENTATION OF RECONSTRUCTION
AND WE WERE ADVISED THAT NO OTHER WORK WILL BE DONE ON THESE AREAS.
IMAGES OF THE GREAT ROOM AS ARBOR HOMES PRESENTED THE HOME TO US AT THE SIGNING. IMAGES OF THE GREAT ROOM AS ARBOR HOMES FINAL PRESENTATION OF RECONSTRUCTION
AND WE WERE ADVISED THAT NO OTHER WORK WILL BE DONE ON THESE AREAS.
IMAGES OF THE MASTER BATHROOM AS ARBOR HOMES PRESENTED THE HOME TO US AT THE SIGNING. IMAGES OF THE MASTER BATHROOM AS ARBOR HOMES FINAL PRESENTATION OF RECONSTRUCTION
AND WE WERE ADVISED THAT NO OTHER WORK WILL BE DONE ON THESE AREAS.
THE AUTHORS OPINION:
WE FEEL THAT ARBOR HOMES
DID NOT
FOLLOW THROUGH WITH THEIR
"CUSTOMER ASSURANCE PLEDGE"
TO MEET OR EXCEED BAGI STANDARDS
.
DISCLAIMER:
THE VIEWS AND OPINIONS EXPRESSED HERE ON THIS WEBSITE, OUR ARBOR HOME, ARE THOSE OF THE AUTHORS. ANY CONTENT PROVIDED BY THE AUTHORS
OF THIS WEBSITE ARE THAT OF THEIR VIEWS AND OPINIONS ONLY.
THE FOLLOWING IMAGES ARE OF OUR ARBOR HOME INCLUDING A DESCRIPTION OF EACH IMAGE. THIS IS WHAT ARBOR HOMES CONSIDERS
TO BE A MOVE IN READY HOME. THESE IMAGES SHOW THE HOME AT THE TIME OF SIGNING AND THE CONDITION THAT ARBOR HOMES WAS WILLING TO PRESENT AS A FINISHED HOME.
INCLUDED ARE ALSO THE IMAGES OF THE HOME AFTER COMPLETING THE REPAIRS. WE WERE TOLD NO OTHER REPAIRS WILL BE DONE.ARBOR
HOMES NEVER MADE AN ATTEMPT TO APOLOGIZE FOR THE INCONVENIENCE THAT THEY CAUSED US DURING THIS LENGTHY PROCESS OF RECONSTRUCTION TO REPAIR THEIR MISTAKES OR TO FIND US OTHER LIVING ARRANGEMENTS. NOTHING, NOT A WORD DURING THIS RECONSTRUCTION PROCESS.ARBOR HOMES LEFT US WITHOUT A KITCHEN AND
TOILET FOR MONTHS AND WITHOUT SHOWERS FOR MANY DAYS.
WE UNDERWENT ALL OF THESE RECONSTRUCTION ISSUES WHILE WE WERE
STILL LIVING IN THE HOME!ARBOR HOMES NEVER MADE AN ATTEMPT TO APOLOGIZE FOR THE INCONVENIENCE THAT
THEY CAUSED US DURING THIS LENGTHY PROCESS OF RECONSTRUCTION TO FIX THEIR MISTAKES OR TO FIND US OTHER LIVING ARRANGEMENTS.
NOTHING, NOT A WORD DURING THIS RECONSTRUCTION, ARBOR HOMES LEFT US WITHOUT A KITCHEN AND TOILET FOR MONTHS
AND WITHOUT SHOWERS FOR MANY DAYS.
ARBOR HOMES CAN MAKE THIS RIGHT BY PURCHASING
OUR ARBOR HOME
BACK FROM US.